How much does house extension cost in 2026?
Extensions are almost always priced per square metre of new floor area. The rate covers the shell (foundations, walls, roof), windows and doors, electrics, plumbing, plastering and basic decoration — but excludes VAT, professional fees and your kitchen or bathroom fit-out. The table below shows typical 2026 build rates by extension type and finish.
| Extension type / spec | Typical 2026 range | Notes |
|---|---|---|
| Single-storey rear (standard) | £1,800–£2,500/m² | Most common project; brick & block |
| Single-storey (premium finish) | £2,800–£3,500/m² | Bi-folds, underfloor heating, bespoke |
| Double-storey extension | £1,700–£2,800/m² | ~50–70% more than single for double the space |
| Side-return extension | £2,500–£3,500/m² | Tight access & lots of glazing push rates up |
| Wrap-around extension | £2,400–£3,300/m² | Combines rear + side return |
| Kitchen extension (typical) | ~£1,850/m²+ | Average finished kitchen extension ~£30,000 |
| London single-storey | £2,800–£4,500/m² | Basic ~£2,800, high-end £4,000–£4,500 |
| London double-storey | £2,800–£4,200/m² | Premium labour & access costs |
What affects the cost
Two extensions of the same floor area can differ by tens of thousands of pounds. The biggest variables are:
- Number of storeys — a double-storey costs roughly 50–70% more than a single but gives you twice the floor space, so it's better value per m².
- Size and shape — simple rectangles are cheapest; L-shapes, curves and glass boxes cost far more.
- Finish level — standard plaster-and-paint versus bi-fold doors, roof lanterns, underfloor heating and a high-spec kitchen.
- Region — London and the South East run 20–40% above the national average.
- Access and groundworks — tight side returns, deep foundations, removing trees or diverting drains all add cost.
- Glazing — large bi-folds, sliding doors and rooflights are a major line item.
Cost breakdown: where the money goes
A healthy budget has four parts: the build, the fit-out and finishes, the professional fees, and a contingency. Roughly:
- Labour — around 40–45% of the total.
- Materials — a similar share to labour.
- Professional fees — 10–15% (architect/designer, structural engineer, party wall surveyor, building control).
- VAT — 20% on most extension work (some energy-saving measures are 0%).
- Contingency — set aside 10–15% on top for surprises.
Builders typically add 15–25% to labour and materials to cover project management and overheads — that's normal and worth paying for the coordination it buys.
Professional fees you can't avoid
The headline £/m² rate rarely includes the team that gets you to site. Budget for:
- Architect / designer — £1,000–£2,500 for a single-storey, rising to £3,000+ for full building-regs and construction drawings. Architects often charge 5–12% of build cost for a full service.
- Structural engineer — £400–£800 for calculations on a simple job, £1,000–£3,000 for more involved steelwork and foundations.
- Planning fee — the householder application fee in England rose to £548 from April 2026 (a Lawful Development Certificate is around £129).
- Building control — £700–£1,500 depending on project value.
- Party wall surveyor — £800–£1,500 per affected neighbour, where a Party Wall Agreement is needed.
Basic vs mid vs premium
Basic (£1,800–£2,200/m²): standard brick-and-block shell, French doors or a standard window run, plaster and paint, basic radiators and a modest kitchen. Perfectly liveable and the smart choice if budget is tight.
Mid-range (£2,400–£3,200/m²): bi-fold or sliding doors, a roof lantern, better flooring, a quality kitchen and underfloor heating. This is where most family projects land.
Premium / London (£3,500–£4,500/m²): structural glazing, bespoke joinery, high-end appliances, MVHR and architect-led detailing. The build quality and finishes are exceptional but the price reflects it.
Common extras and hidden costs
The quote you sign rarely covers everything. Watch for:
- Kitchen or bathroom units, worktops and appliances (often £8,000–£25,000+ on their own).
- Knocking through into the existing house and making good.
- Upgrading or relocating the boiler, consumer unit or drainage.
- Deeper foundations if the ground or nearby trees demand it.
- Landscaping and reinstating the garden after the build.
- Asbestos removal in older properties.
- The 10–15% contingency you'll almost certainly dip into.
How to save money without cutting corners
You can trim a lot without ending up with a poor result:
- Keep the shape simple — a clean rectangle is far cheaper than curves or a frameless glass box.
- Stay within permitted development where possible to skip the planning fee and weeks of waiting.
- Don't move services — keep kitchen and bathroom fittings near existing pipes and drains.
- Phase the fit-out — finish the shell now, upgrade finishes later when funds allow.
- Fix the design before you start — mid-build changes are the most expensive money you'll spend.
- Get at least three detailed quotes and compare line by line, not just the bottom line.
Is an extension worth it?
For most homeowners, yes — a well-designed extension adds usable living space and typically adds value, especially when it creates a sought-after open-plan kitchen-diner. It's almost always cheaper than moving once you factor in stamp duty, estate agent and legal fees. Just be realistic: in some areas you can over-improve beyond the ceiling price for the street, so check what extended homes nearby actually sell for before committing to a premium spec. This is not a DIY job — groundworks, structural openings and building regs all require professionals.
Regional price differences (2026)
Where you live is one of the biggest single factors in 2026. London and the South East command a clear premium on both labour and materials, while parts of the North, Scotland and Wales can be noticeably cheaper.
| Region | Typical 2026 range |
|---|---|
| London | £2,800–£4,500/m² |
| South East | £2,400–£3,500/m² |
| Midlands | £1,900–£2,800/m² |
| North of England | £1,700–£2,500/m² |
| Scotland & Wales | £1,650–£2,400/m² |
Cost estimator
Estimate a ballpark build cost for your extension based on size, storeys, finish and region.
This estimate is a budgeting tool, not a quote. Real prices vary — get local quotes for an accurate figure.
Get real quotesHow to save money
- Design within permitted development limits where you can to avoid the £548 planning fee and weeks of waiting.
- Keep the footprint a simple rectangle — every curve, corner and glass wall adds cost.
- Position the kitchen and bathroom near existing services so you're not paying to move pipes and drains.
- Lock the design and electrical layout before breaking ground; mid-build changes are the priciest of all.
- Get at least three itemised quotes and compare them line by line, not just on the total.
- Phase the finishes — get the shell watertight now and upgrade flooring, kitchen and bi-folds later.
- Build in spring or summer for more competitive prices and fewer weather delays.
- Hold a 10–15% contingency separately so an unexpected foundation issue doesn't derail the whole project.
How long it takes
- Design, drawings and quotes: 3–6 weeks before anything is committed.
- Planning (if needed) or a Lawful Development Certificate: around 8 weeks; permitted development can skip this.
- Building regs approval and party wall notices: 4–8 weeks, often overlapping with design.
- Single-storey build on site: typically 10–14 weeks from breaking ground.
- Double-storey build on site: typically 14–20 weeks.
What's usually included
- Foundations, walls, roof and the weathertight shell
- Windows and external doors as specified
- First and second-fix electrics and plumbing
- Plastering and basic decoration
- Standard heating (radiators) connected to the existing system
- Builder's project management and site overheads
What's usually extra
- 20% VAT (unless covered by a 0% energy-saving exception)
- Architect, structural engineer, planning and building control fees
- Kitchen and bathroom units, worktops and appliances
- Party wall surveyor fees where neighbours are affected
- Premium upgrades — bi-folds, roof lanterns, underfloor heating
- Landscaping and garden reinstatement after the build
How to choose the right builders
An extension is a structural project, so use an established builder with a verifiable track record and proper insurance. Look for membership of a recognised body such as the Federation of Master Builders (FMB) or TrustMark, and never pay large sums up front.
- Are you FMB or TrustMark registered, and can you show proof?
- Can I see two or three recent extensions you've completed, ideally in person?
- Do you carry public liability and contractor's all-risk insurance?
- Is the quote fully itemised, and exactly what's included and excluded?
- Who manages structural engineering, building control sign-off and inspections?
- What's the payment schedule — staged against milestones, not a big deposit?
- What's your realistic start date and programme, and what happens if it overruns?
- Do you offer a workmanship warranty or insurance-backed guarantee?
House extension cost FAQs
How much does a house extension cost per m² in 2026?
Outside London, budget £1,800–£3,200/m² for the build (ex-VAT), depending on storeys and finish. In London and the South East expect £2,800–£4,500/m². Add 20% VAT and 10–15% professional fees on top.
How much is a typical single-storey extension all-in?
For a 15–30m² single-storey rear extension, most homeowners pay £40,000–£90,000 including VAT and fees. A simple 20m² project often lands around £55,000–£65,000.
Is a double-storey extension better value?
Per square metre, yes. A double-storey costs roughly 50–70% more than a single but doubles the floor area, so the cost per m² is lower. Outside London expect £1,700–£2,800/m².
Do I need planning permission?
Often not. Many single-storey rear extensions qualify as permitted development (up to 3m for terraced/semi, 4m for detached, or 6m/8m under the larger scheme with neighbour consultation). Conservation areas, listed buildings and flats have restrictions, so always check.
Does VAT apply to an extension?
Yes — standard 20% VAT applies to most extension work. Certain energy-saving measures such as heat pumps, insulation, MVHR and solar PV currently qualify for 0% VAT.
What are the professional fees?
Budget 10–15% of the build cost: architect/designer £1,000–£3,000, structural engineer £400–£3,000, planning fee £548 (England, from April 2026), building control £700–£1,500, plus £800–£1,500 per neighbour for a party wall surveyor where needed.
How long does an extension take?
Allow 3–8 weeks for design, planning and building regs before site work. A single-storey build is typically 10–14 weeks on site; a double-storey is 14–20 weeks.
What's a party wall agreement and will I need one?
If you're building near or against a shared boundary you must serve notice on affected neighbours under the Party Wall Act. If they don't consent, you'll appoint a surveyor at around £800–£1,500 per neighbour.
How much should I keep as contingency?
Set aside 10–15% of the build cost. Use 10% for a straightforward, recently surveyed home; budget the higher end for older properties, conservation areas, or anything with unknowns underground.
How can I keep the cost down?
Keep the shape simple, stay within permitted development, avoid moving services, fix the design before starting, get three itemised quotes, and phase the expensive finishes if money is tight.